Perspectives in Modern Project Scheduling

Besorgungstitel - wird vorgemerkt | Lieferzeit: Besorgungstitel - Lieferbar innerhalb von 10 Werktagen I

149,36 €*

Alle Preise inkl. MwSt.|Versandkostenfrei
ISBN-13:
9780387336435
Veröffentl:
2006
Erscheinungsdatum:
30.05.2006
Seiten:
444
Autor:
Joanna Jozefowska
Gewicht:
907 g
Format:
236x157x30 mm
Sprache:
Englisch
Beschreibung:

This book surveys the current state-of-the-art in operations research. The book summarizes the current developments and theoretical achievements in the field, including project uncertainty and grid resource management. It further covers the range of the key models in the field, including deterministic, probabilistic, single- and multi-mode, single- and multi-objective, and a general model on discrete-continuous resources.
Edited by two leading researchers in project scheduling, Joanna Jozefowska and Jan Weglarz. Jan Weglarz is one of the most distinguished members of the OR/MS community and a recipient of the EURO Gold Medal
Models.- A Practical and Accurate Alternative to PERT.- Proactive-Reactive Project Scheduling Trade-Offs and Procedures.- Resource Constrained Project Scheduling Models under Random Disturbances.- Due Dates and RCPSP.- RCPS with Variable Intensity Activities and Feeding Precedence Constraints.- Modelling Setup Times in Project Scheduling.- Algorithms.- Lower Bounds for Resource Constrained Project Scheduling Problem.- Justification Technique Generalizations.- A Metaheuristic Approach to the Resource Constrained Project Scheduling with Variable Activity Durations and Convex Cost Functions.- A Hybrid Genetic Algorithm Based on Intelligent Encoding for Project Scheduling.- Population Learning Algorithm for the Resource-Constrained Project Scheduling.- Resource Constrained Project Scheduling: a Hybrid Neural Approach.- Applications.- Selection and Scheduling of Pharmaceutical Research Projects.- Grid Multicriteria Job Scheduling with Resource Reservation and Prediction Mechanisms.- Resource-Constrained Project Scheduling with Time Windows.- CP-Based Decision Support for Project Driven Manufacturing.

Kunden Rezensionen

Zu diesem Artikel ist noch keine Rezension vorhanden.
Helfen sie anderen Besuchern und verfassen Sie selbst eine Rezension.

Google Plus
Powered by Inooga